Progress of construction

In the first section, the installation of a metal frame of the pitched roof was completed, and fire protection works were completed. Preparatory work is underway to arrange the truss part of the roof. Installation of the first layer of mineral wool on the street. Sahaidachny. Installation of translucent enclosing structures (SPOK) of the 2nd floor is performed, installation of SPOK of the 1st floor is performed from the street. Sahaidachny. Window openings are being prepared for the installation of SPOK from the patio. A monolithic floor slab is being constructed above the 4th floor of the second section. The outer walls of the 3rd floor of the second section are being laid.